Oil Well Conductor Installation 2

Client: Mancal Energy
Location: Ballintoy, Co. Antrim

Application: Set conductor casing for exploration well

Job Description:

Using our impressive Dual Rotary drilling rig we set 40 feet of  20” conductor casing and drilled open hole in the bedrock to 500 feet through basalt into the chalk.

 

Equipment Used:

Rig 1 DR24, Volvo FM9 8x4 Flatbed with Long reach Crane and dual compressors.

Drilling Methods: Down the hole hammer drilling and air flush with foam injection
Ground Conditions: Basalt and Chalk